Civil engineering update: Airport Link

For you civil engineering buffs, here’s an update on some of the work happening at the Suvarnabhumi Airport Rail Link construction site.  First, a little background:

The Airport Link is a 28.6 km (17.7 mile) mostly elevated train way that will serve as the eastern half of the “Light Red Line” in Khrungthep’s master transit plan.  The western half of the line is a planned extension north to connect to Don Meuang domestic airport, with no specific time frame in which that will occur.  Started in 2005, construction of the eastern half is expected to be finished sometime in late 2008, with recent news reports puting the construction at a 70% completion rate as of this point.  Both local and express services will be offered on the line. 

P1020198

Above: “We apologize for any inconvenience as we build the maintenance complex for the airport train.”  The picture is of the delivery of the first of nine Siemens Desiro class 360/2 trainsets arrives in Thailand.

The express train will run from the Makkasan City Air Terminal (at the corner of Phetburi and Asoke Roads, where you will be able to connect with the MRT subway Blue Line) to the basement level of Suvarnabhumi Airport in 15 minutes.  It is expected that you will be able to check in for flights at the Makkasan CAT, receiving your boarding pass and handing over your checked baggage, just like at the Airport Express terminal in Hong Kong.

The local train will run from the Phaya Thai station, (where you will be able to connect with the BTS Skytrain Sukhumvit Line), stopping at Ratchaprarop, Makkasan, then at four additional stops before arriving at the airport.  The total trip time for the local service will be 27 minutes.  The initial plans had several additional stops along the lines, including one at Royal City Avenue, a popular nightlife and entertainment district.  It appears that those stops will not be built at this time but just based on my own visual assessment of the construction in the RCA area, it looks like the tracks are being constructed in such a way that a station could be added in the future. 

The Airport Link’s maintenance yard and depot will be in the Soonvijai district, an area on the north side of Phetburi Road from roughly Thong Lor to Ekkamai.  Bangkok Hospital is located just to the west of this area and Tawn’s parents live just on the other side of Ekkamai Road, to the east of this area.

Sunday morning while running errands I stopped to snap some photos of the construction:

P1020050

Above: From the Ekkamai Road flyover, looking west.  On the left is the Soonvijai train station with a train stopping momentarily before continuing on to Hua Lamphong Station.  On the far side of the buildings that face the train station is Phetburi Road.  Bangkok Hospital is the white building on the right hand side of the picture, behind the construction site.  The elevated track is clearly visible on the left and the ramp where trains will exit and enter the main line is being built along the elevated track in the center of the picture.  The maintenance sheds are under construction in the center and right side of the picture.

Below: Taken from the other end of the above picture and looking to the east, you can see the construction of the exit/entry ramp where trains will connect with the elevated line (right) via the ramp (center).  The Soonvijai station is on the right side of the ground-level rail line, now occupied as the train has left the station.

P1020192

Below: Turning around from the above picture and looking west along the tracks, towards Makkasan Station.  The Royal City Avenue sign that is blocked by construction is a bit deceptive.  Before construction started, there was a frontage road along the rail tracks that you could drinve from the area where the picture was taken (which is essentially the entrance to Bangkok Hospital) to the entrance of the RCA entertainment district about 300 meters to the west.  That road is gone and, I assume, will not reopen.

P1020195

P1020201

Above: A look inside one of the mainenance sheds, where you can see the rails have been laid and the catwalks that will run along the side of the trains have already been installed.

For more information, 2bangkok.com maintains a space dedicated to this project.